Design & Construct

Location: Sydney
Client: JLL

The Solution

Two spec suite fitouts on Levels 29 & 30, Aurora Place, with varied design elements and a compressed timeframe.

Complete fitouts including new walls, flooring, electrical, mechanical and hydraulic services, workstations, joinery, curtains, ceilings and painting.

Sustainability was taken into account with the equipment of sensors and timers on air conditioning units to control its usage.

Vinyl flooring was replaced in reception areas with timber and tiles, along with the use of timber feature screens and ceilings, fabric blinds, stone splashbacks and stone tiles throughout the suites.

Simultaneous construction of both suites, coupled with sensitive tenants and significant variations requested by the client after work began, meant noisy operations had to be completed after hours.

Size sq.

Completion Date

Week Turnaround

Photo Gallery